(This phase is required when pipe chopping is completed from 3mtr pipe to any needed duration through installation) After cutting, the pipe really should be chamfered from the outer sides. It can be a good idea to deliver an close to 2mm large, 150 chamfer on spigot stop. PVC fittings https://austropipes.com/swr-pipes-and-fittings-manufacturer/